BlackBerry Forums Support Community
              

Closed Thread
 
LinkBack Thread Tools
Old 03-19-2006, 05:45 PM   #1 (permalink)
New Member
 
Join Date: Mar 2006
Location: Colorado
Model: 8320
Carrier: T-Mobile
Posts: 11
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default BBToday, can't remove plug-ins or change order

Please Login to Remove!

Hey all,

Installed BBToday and it won;t let me remove the stocks plugin or change the order of the plugins. Have tried about 20 times, saved after each change and it sill is the same.

Any ideas on what the heck is going on?

7100t
4.0.2.49
Offline  
Old 05-31-2006, 09:42 AM   #2 (permalink)
Knows Where the Search Button Is
 
jophes49087's Avatar
 
Join Date: Oct 2005
Location: Schoolcraft MI
Model: 8330
OS: v4.5.0.13
PIN: 30AC3009
Carrier: verizon
Posts: 30
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default

Tiffster:
Sorry I didn't see this earlier. I also want to remove the browser plugin for Accu-weather. It would be great if they actually had my hometown in their deal. The only thing I can think of is to change the settings until it just doesn't work. The thing drives me nuts. If I find something I will let you know. The other thought I had was to remove the cookie. I will try that and get back to you. Joe
__________________
PIN 4006C1A7
Offline  
Old 05-31-2006, 11:02 AM   #3 (permalink)
Knows Where the Search Button Is
 
jophes49087's Avatar
 
Join Date: Oct 2005
Location: Schoolcraft MI
Model: 8330
OS: v4.5.0.13
PIN: 30AC3009
Carrier: verizon
Posts: 30
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default

Tiffster:
The only thing I can come up with was going to the browser push services menu and unsubscribing to the plugins I had. Sounds like you have already tried that. Hmmm.
ps: removing the cookies didn't work.
__________________
PIN 4006C1A7

Last edited by jophes49087 : 05-31-2006 at 11:05 AM.
Offline  
Closed Thread


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

SL2100 VoIP Daughter Board
$334.82
SL2100 VoIP Daughter Board pictureOBIHAI TECHNOLOGY OBI300 1PORT VOIP ADAPTER USB T38 FAX
$48.95
OBIHAI TECHNOLOGY OBI300         1PORT VOIP ADAPTER USB T38 FAX pictureAvaya IP Office Combo Card V2 700476013 Telephone Phone System PBX IP VOIP
$85.0
Avaya IP Office Combo Card V2 700476013 Telephone Phone System PBX IP VOIP  pictureCisco CP-7940G Unified VoIP Business Office IP Speaker Phone w/Handset
$7.99
Cisco CP-7940G Unified VoIP Business Office IP Speaker Phone w/Handset pictureRevolabs 10-FLX2-200-VOIP Conference Phone
$349.0
Revolabs 10-FLX2-200-VOIP Conference Phone  picture






Copyright 2004-2016 BlackBerryForums.com.
The names RIM and BlackBerry are registered Trademarks of BlackBerry Inc.