Hi,
We have a customer with a SBE BES with 15 CALs.
He would like to add at least one CAL.
What can we do:
- is the upgrade towards a BPS possible ? (limited to 30 CALs)
- is the upgrade towards a full BES possible ?
Also, do you have an idea of the economic consequences of these solutions ?
Thankx.
