BlackBerry Forums Support Community
              

Closed Thread
 
LinkBack Thread Tools
Old 05-30-2008, 10:02 AM   #1 (permalink)
New Member
 
Join Date: May 2008
Model: Pearl
PIN: N/A
Carrier: Alltel
Posts: 5
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default Is there a way to change order of text messages read?

Please Login to Remove!

Hey when I'm texting and having a conversation with someone, is there a way to change the order of the messages? Right now, the newer messages are at the top, but I want it to read like a thread, I want the older messages at the top and the newer ones at the bottom. Is this possible?
Offline  
Closed Thread


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Burner Inc - LP Gas Coil Style Propane Burner - Melt, Weeds, Roofing, Pave, Cook
$115.0
Burner Inc - LP Gas Coil Style Propane Burner - Melt, Weeds, Roofing, Pave, Cook pictureC25CNB130T Eaton / Cutler Hammer Contactor - 30 Amp • 1 Pole • 24V Coil
$16.5
C25CNB130T Eaton / Cutler Hammer Contactor - 30 Amp • 1 Pole • 24V Coil pictureFurmas Definite Purpose Contactor 61447 replaces 42CF35AG 3 POLE 208/240V Coil
$69.0
Furmas Definite Purpose Contactor 61447 replaces 42CF35AG 3 POLE 208/240V Coil pictureAllen Bradley 700-F400A1 120/110 VAC Coil 4 NO Relay 700F400A1 700
$11.99
Allen Bradley 700-F400A1 120/110 VAC Coil 4 NO Relay 700F400A1 700 pictureGE CL01A310TJ U 13.8A 600V 3P Coil120 New
$60.0
GE CL01A310TJ U 13.8A 600V 3P Coil120 New picture






Copyright 2004-2016 BlackBerryForums.com.
The names RIM and BlackBerry are registered Trademarks of BlackBerry Inc.