BlackBerry Forums Support Community
              

Closed Thread
 
LinkBack Thread Tools
Old 03-16-2007, 06:51 PM   #1 (permalink)
New Member
 
Join Date: Mar 2007
Model: 9000
Carrier: AT&T
Posts: 10
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default Change order of apps...

Please Login to Remove!

Hello,
I was wondering when I have my pearl showing only the 6 icons on the left (apps) how can I change what apps those are?
Offline  
Old 03-16-2007, 07:04 PM   #2 (permalink)
Talking BlackBerry Encyclopedia
 
mrpg's Avatar
 
Join Date: Oct 2006
Location: NY
Model: 8320
Carrier: T-Mobile
Posts: 328
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default

Press menu, to goto the icon screen, select icon you want to move, then press Alt+Menu, then select Move Icon. The first 6 icons will show up on home screen.
Offline  
Old 03-17-2007, 03:59 PM   #3 (permalink)
Talking BlackBerry Encyclopedia
 
netPOSER's Avatar
 
Join Date: Jun 2005
Model: 9800
Carrier: ATT
Posts: 210
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default

Quote:
Originally Posted by AboveNBeyond
Hello,
I was wondering when I have my pearl showing only the 6 icons on the left (apps) how can I change what apps those are?
That theme will show your first 5 icons on the home screen.

You can easily move icons by going to the second screen, high-light the icon you wish to move, select the menu button (left of track ball), select "Move Icon", then use the track ball to move the icon where you want, then press the track ball once to keep it there.
Offline  
Closed Thread


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

(2) 6800uf 80v 85c Panasonic Electrolytic Filter Capacitors 30x51 NEW
$15.99
(2) 6800uf 80v 85c Panasonic Electrolytic Filter Capacitors 30x51 NEW pictureCapacitor 33uF50V 105C [4] Electrolytic Capacitors Canada
$4.32
Capacitor 33uF50V 105C [4] Electrolytic Capacitors   Canada pictureCapacitor 2A471J 100V .00047UF .47nF Polyester Film in Canada
$3.93
Capacitor 2A471J 100V .00047UF .47nF Polyester Film  in Canada pictureCapacitor100uF 6.3V 85C [4] Elna FL Electrolytic Canada
$4.72
Capacitor100uF 6.3V 85C [4] Elna FL Electrolytic    Canada pictureCapacitor 220uF 6.3V 85c Audio Electrolytic Capacitor [4] Canada
$4.72
Capacitor 220uF 6.3V 85c Audio Electrolytic Capacitor [4]  Canada picture






Copyright 2004-2016 BlackBerryForums.com.
The names RIM and BlackBerry are registered Trademarks of BlackBerry Inc.