BlackBerry Forums Support Community
              

Closed Thread
 
LinkBack Thread Tools
Old 07-10-2007, 11:31 AM   #1 (permalink)
dbo
Thumbs Must Hurt
 
Join Date: Jun 2007
Model: 8300
PIN: N/A
Carrier: AT&T
Posts: 51
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default Agenda view in calendar collapsed?

Please Login to Remove!

Not sure if this is specific to the Curve OS, but when I scroll forward in Agenda view of the calendar, once I get to beyond a week forward (ie July 18th as of today), I no longer see all the appts on the days I'm looking at - only the first line of the first one. If I hit "Go to date" it then displays everything on those dates.

Is there any way to disable this collapsed view of the dates ahead? I frequently scroll ahead to see what free time slots I have in the coming weeks, but this is unreliable if the view is collapsed.

Thanks.
Offline  
Closed Thread


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

FANUC isolation amplifier A45L-0001-0464 used
$60.0
FANUC isolation amplifier A45L-0001-0464 used  pictureNuclear Chicago Gieger Counter has built in amplifier
$125.0
Nuclear Chicago Gieger Counter has built in amplifier pictureMoseley DC Amplifier Model CSA-3
$79.0
Moseley DC Amplifier Model CSA-3 pictureEmerson Control Techniques AX-4000-00-0M-03C Axis Module / Controller / Servo
$750.0
Emerson Control Techniques AX-4000-00-0M-03C Axis Module / Controller / Servo  pictureAllen-Bradley 2094-BC02-M02-S, Kinetix 6000 Sercos, Integrated Axis Module 15kW
$829.0
Allen-Bradley 2094-BC02-M02-S, Kinetix 6000 Sercos, Integrated Axis Module 15kW picture






Copyright 2004-2016 BlackBerryForums.com.
The names RIM and BlackBerry are registered Trademarks of BlackBerry Inc.