01-19-2007, 05:21 AM
|
#1 (permalink)
|
| New Member
Join Date: Jan 2007 Location: Le Havre, France Model: 7130V Carrier: sfr
Posts: 5
Post Thanks: 0 Thanked 0 Times in 0 Posts
| Bug in Calendar on 7130V Please Login to Remove! Hi everyone in here !
I'm newbie with a fresh new BB 7130V and i've got a trouble with the calendar.
When I create a new entry in the calendar and I check the "Full day" option (don't know the exact caption in english 'cause my BB is in french !), the start date is the good one (the one where I was when I've activated the New entry command in the menu) but the end date is set automatically by my BB to the day before.
If I use IntellySync to synchronize my BB with my Lotus Notes calendar, the problem is the same : An entry set as a "full day event" in Lotus is created on the BB with the end date the day before the strat date !!
Any Idea ?
thanx for your replies !
Christophe
P.S. : Excuse for my poor english ! |
| Offline
| |