BlackBerry Forums Support Community
              

Closed Thread
 
LinkBack Thread Tools
Old 07-20-2007, 04:11 AM   #1 (permalink)
New Member
 
Join Date: May 2007
Model: 8700g
PIN: N/A
Carrier: Airtel India
Posts: 2
Post Thanks: 0
Thanked 0 Times in 0 Posts
Default Distinguish between completed and incomplete tasks in Agenda view

Please Login to Remove!

Hello Fellow crackberry users,

Is there any way to distinguish completed tasks from the incomplete ones in the Calendar-Agenda view in the 8800. The 8700 does it so smoothly, by having a red icon on the right beside incomplete tasks and a green one next to completed ones.

I really would like to upgrade to a 8800 and use the GPS features together with the voice recorder. But i practically live on the agenda view and it would seriously hamper my productivity if I have to think through every time I look at my task list if this one's complete or not.

Thanks so much in advance guys!
Offline  
Closed Thread


Thread Tools

Posting Rules
You may not post new threads
You may not post replies
You may not post attachments
You may not edit your posts

vB code is On
Smilies are On
[IMG] code is On
HTML code is Off
Trackbacks are On
Pingbacks are On
Refbacks are On

Fuji Electric General-Purpose Inverter FVR-E9S FVR0 2E9S-2S
$116.4
Fuji Electric General-Purpose Inverter FVR-E9S FVR0 2E9S-2S pictureDelta VFD Inverter Frequency converter
$200.0
Delta VFD Inverter Frequency converter picture160 Amp Stick ARC DC Inverter Welder 115/230 Dual Voltage Input Welding Machine
$239.99
160 Amp Stick ARC DC Inverter Welder 115/230 Dual Voltage Input Welding Machine pictureNEW Siemens Inverter IGBT module 6SY7000-0AE73 for industry use
$100.0
NEW Siemens Inverter IGBT module 6SY7000-0AE73 for industry use picture6Se64402ud222ba1 6Se6 440-2Ud22-2Ba1 Siemens Inverter New W
$536.97
6Se64402ud222ba1 6Se6 440-2Ud22-2Ba1 Siemens Inverter New W picture






Copyright 2004-2016 BlackBerryForums.com.
The names RIM and BlackBerry are registered Trademarks of BlackBerry Inc.