Quote:
Originally Posted by Placeman
I'm not sure if this is a BB or BES issue.
When I mark a task as completed on my BB 7100i, it does not report the date completed back to the Exchange server. If I pull up the task in Outlook, the "Date Completed" field is empty.
I couldn't find a setting on the BB, so the only thing I could think of is that the BES may be able to date stamp the task once it's completed.
Any ideas?
|
I have the same issue Placeman and have reviewed the BES with no options for correcting the issues found there either. I am using a 8800 and Exch 2003 with BES 4.1 or 4.2, whatever the most current release is. I have had BB's for awhile now and I don't remember this being a problem on the 8700 I had but the software on it was not as current as my 8800. Since I have been reviewing the problem I have had little success finding a resolution so I am not sure this is a wide spread issue.
If I find a fix I will try to remember to post the answer to the forum.